Electrical service will improve starting Sunday with the recovery of 525 MW
The Minister of Energy and Mines, Joel Santos, reported that the country’s electrical service will experience a significant improvement starting Sunday, thanks to the reincorporation to the National Interconnected Electrical System (SENI) of generating plants that, together, will contribute 525 megawatts to the installed capacity.
Santos explained that the recent power cuts have been caused, mainly, by two factors: the extraordinary increase in demand, due to the high temperatures recorded in the national territory and the recent shutdown of several generation plants for technical reasons.
Among the units that have been affected is Punta Catalina 2, with a capacity of 360 megawatts, which is scheduled to be reintegrated between the early hours of this Saturday and Sunday. Likewise, Los Mina V, with 120 megawatts, which was reincorporated into the SENI at noon this Friday, while the SIBA plant temporarily reduced 45 megawatts due to the process of closing its current cycle to move to a combined cycle, reintegrating that capacity during this Friday.
“Between today and Sunday we will recover a total of 525 megawatts, which will allow us to reduce interruptions and stabilize the energy supply to the population, putting us in a better position to combat the high temperatures that affect, not only the country, but the rest of the world,” the minister assured.
In addition, Santos announced that in the next six months the country will have a new generation that will reinforce the stability of SENI. In October, the Energas 4 plants, with 130 megawatts, and the expansion of SIBA, with an additional 68 megawatts, will come into service.
He assured that the Energía 2000 plant, which will provide 414 megawatts, is scheduled to begin operations in the first quarter of 2026, for a total of 612 megawatts of new installed capacity.
“The government of President Luis Abinader prioritizes offering a reliable and quality electricity service. We are making every effort to ensure that the energy provided meets the needs of the population and the productive sector,” concluded Santos.
#Most read
- 1.Metastases reportedly disappear in first patient treated with Russia’s experimental cancer vaccine
- 2.Giancarlo Miguel Tejada denies allegations of sexual assault against niece while being transferred to the Palace of Justice
- 3.Man steals giant golden Jesus statue from church and smashes it while posing for a photo
- 4.VIDEO: Plane crashes at Maldives airport, leaving crew member injured
- 5.Apple equips its AirPods with translation in English, Spanish, Portuguese, French, and German
- 6.84% of teenage girls in Spain fear that AI will use their photos to create fake sexual content
- 7.Nvidia: From Video Games to the World’s Summit as a Colossus of Artificial Intelligence
- 8.Roberto Ángel Salcedo heads the first preparatory meeting for the 2026 carnivals
- 9.NASA launches three missions to map the heliosphere and study the solar wind
- 10.At least 12 U.S.-bound flights delayed at Punta Cana airport amid FAA restrictions
Newsletter
Subscribe to our newsletter to receive our latest articles instantly!
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.



