GoldQuest receives the terms of reference to begin environmental studies at the San Juan mine

Santo Domingo.- GoldQuest Mining Corp., responsible for the Romero Project in the province of San Juan, Dominican Republic, reported that the company has received the official Terms of Reference (TOR) from the Ministry of Environment and Natural Resources, marking the formal start of the final phase of the Environmental Impact Assessment (EIA), a crucial milestone for obtaining the environmental license necessary for underground operation.
The reception of the TDR allows GoldQuest to begin comprehensive environmental studies, ensuring compliance with the highest international standards in environmental protection and community relations.
“From this initial stage of Environmental Studies, we are committed to working hand in hand with the communities, in a transparent and participatory manner, so that their voices are heard at every stage of the process. Our goal is to generate the greatest possible benefits for the families and communities of San Juan, while significantly minimizing environmental risks,” said Luis Santana, CEO of GoldQuest.
GoldQuest also reported that it will formally work with the Academy of Sciences of the Dominican Republic, a request that highlights the company’s willingness to ensure that the study is carried out in accordance with current regulations and under the highest standards of scientific integrity, generating trust in institutions, communities and Dominican society.
In parallel, the company has initiated the process of hiring an international environmental consulting firm of high prestige, which will lead the elaboration of the EIA, in collaboration with a team of qualified Dominican environmental professionals.
The Romero Project is conceived as a state-of-the-art underground mine, designed to produce a copper concentrate with gold and silver content, through flotation processes without the use of polluting chemicals. It will include cutting-edge technology, recycling of process water, strict environmental controls, and high standards of operational efficiency and safety. The comprehensive infrastructure plan includes the construction of an access road, a processing plant, fiber optic facilities and a 69 kV power line connected to the national electricity system.
#Most read
- 1.Armed men attack U.S.-flagged vessel in Haiti’s Port-au-Prince Bay
- 2.Solange Omon, from Cameroon, is chosen as the new Victoria’s Secret angel
- 3.5D Cinema in Japan surprises the world with an immersive experience that goes viral
- 4.Now in Italy! Riots erupt in Milan as protesters loot stores and clash with police
- 5.VIDEO: Witnesses say man prayed and bowed to tiger before fatal zoo attack in England
- 6.VIDEO: Guatemalan teenager wakes up inside her coffin after being presumed dead
- 7.VIDEO: iPhones and luxury perfumes float in the Strait of Hormuz after cargo ship sinks
- 8.Iguazú Falls surge forces closure of Devil’s Throat walkway in Brazil
- 9.Dominican man shot by ICE in the Bronx had robbery conviction and pending drug charges
- 10.The Panama Canal begins evaluation of companies interested in building two ports
Newsletter
Subscribe to our newsletter to receive our latest articles instantly!



