Luis Abinader at the inauguration of Metro Line 2C: “Today we open a new future for SDO”

Carolina Álvarez
3 Min Read
Los Alcarrizos.– President Luis Abinader stated this Tuesday that the inauguration of Line 2C of the Santo Domingo Metro marks a before and after for thousands of families in Los Alcarrizos, Pantoja and surrounding communities, assuring that the work directly transforms the quality of life of the people.

“Today we are not simply cutting a ribbon, today we are closing a long wait and opening a new future”, expressed the president when leading the official act, accompanied by the first lady Raquel Arbaje, ministers, legislators, municipal authorities and representatives of the transport sector.

Abinader recalled that for years the residents of this area left their homes before dawn and returned late at night due to the prolonged traffic jams, uncertainty and the high cost of transportation. “Today Santo Domingo Oeste ceases to be far away; mobility ceases to be an obstacle and begins to be an opportunity“, he said. The Metro Line 2C runs 7.3 kilometers from the María Montez station to the entrance of Los Alcarrizos, connecting 14 densely populated communities along the Duarte highway, with five stations: Pedro Martínez, Franklin Mieses Burgos, 27 de Febrero, Freddy Gastón Arce and Pablo Adón Guzmán.
You can also read: Abinader inaugurates Metro Line 2C
As explained by the Head of State, the new infrastructure will benefit more than a million inhabitants, incorporating about 500 thousand new users to the Integrated Transportation System. He highlighted that the complete journey can be made in approximately 10 minutes between stations, which will allow a saving of up to two hours a day during peak hours for those who previously spent up to an hour and a half per journey. “Two hours returning home, to rest, to study and to share with the family,” underlined Abinader, while highlighting that users will be able to reduce their transportation expenses by up to 60%, which translates into greater savings capacity and stability for working families. The president emphasized that this work is not just an infrastructure project, but a concrete response to a real need, and a demonstration that when the State listens, plans, and perseveres, it can transform people’s lives.
Share This Article