Manzanillo Power Land fails to inject energy into the SENI with stability months after its inauguration

The Manzanillo Power Land thermoelectric generation plant has failed to inject energy with stability into the National Interconnected Electric System (SENI), after having been inaugurated on March 27th.
Since then, the power plant has been listed as unavailable for periods of several days and available at others, according to the records of the SENI Coordinating Body.
Since its inauguration, the plant, from which an injection of up to 414 MW is expected, has been wavering in the amount of energy it produces and in the days it manages to remain injecting.
Your injection records range between 170 MW and 285 MW. One day you managed to inject 485 MW, this past March 8th.
The inauguration ceremony of this important power plant was attended by President Luis Abinader, who described the work as a project of faith, hope, development, and economic feasibility.
Upon its inauguration, the Minister of Energy and Mines, Joel Santos, explained that the commissioning of Manzanillo Power Land, together with the 128-kilometer, 345-kilovolt transmission line inaugurated in July 2025, marks a milestone on the path toward the development and transformation of the country’s energy system, thanks to the government’s vision to guarantee, responsibly, energy security in an increasingly turbulent world.
#Most read
- 1.Woman fined for sitting on playground bench while crying in Germany
- 2.84% of teenage girls in Spain fear that AI will use their photos to create fake sexual content
- 3.Roberto Ángel Salcedo heads the first preparatory meeting for the 2026 carnivals
- 4.Apple equips its AirPods with translation in English, Spanish, Portuguese, French, and German
- 5.Nvidia: From Video Games to the World’s Summit as a Colossus of Artificial Intelligence
- 6.NASA launches three missions to map the heliosphere and study the solar wind
- 7.Melissa Medina was accompanied by a 60-year-old man and a Venezuelan friend at the time of her death
- 8.Meet the 10 participants of “La Casa de Alofoke”
- 9.Alofoke’s House 3, return of an impact phenomenon
- 10.Santiago Matías announces Plací as the newest member of “La Casa de Alofoke 3”
Newsletter
Subscribe to our newsletter to receive our latest articles instantly!
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.





